Location:

London

Client:

Teighmore Construction

Main Contractor:

Mace Group

Engineer:

WSP Cantor Seinuk

Architect:

Adamson Associates

Tonnage:

12,700

Completion Date:

01/12/2011


Overview:

The Shard at London Bridge, is the tallest building in Western Europe standing at 310m and provides approximately 55,800 sqm of hotel, luxury residential accommodation and office space.

Severfield was responsible for the connection design and fabrication of approximately 12,700 tonnes of structural steelwork, of which 7,500 tonnes arecoated with fire protection paint and 6,000 tonnes are Fabsec plated beams with bespoke service openings.

The company also supplied and fixed the metal decking, edge protection and stairs throughout. Severfield'?s in-house erection team was utilised for the erection of the steelwork.


Related Projects