Learn how this iconic entertainment arena in Leeds came into being. Severfield provided the connection design, fabrication and erection for the 4,000 tonnes of structural steelwork incorporated into the structure. This ‘Framed in Steel’ case study was produced by The British Constructional Steelwork Association Ltd (BCSA).