Location:
Dublin, Ireland
Client:
Treasury Holdings
Main Contractor:
CMP
Engineer:
Arup Associates
Architect:
O'Mahony Pike
Tonnage:
2,200
Completion Date:
12/14/2009
Overview:
Adjacent to Grand Canal Dock DART station, this commercial office building has direct water frontage.
The project comprises of 19,400sqm of office accommodation over 15 storeys, which makes it the tallest building in Dublin to date. In addition, three basement floors provide 80 car parking spaces.
Severfield was responsible for the connection design, fabrication and erection of approximately 2,200 tonnes of structural steelwork utilised in the construction of the project.
The company also supplied and fixed the metal decking, edge protection and stairs throughout and used the group'?s handling system ?Seversafe offload system? on site. The project was completed on schedule with a creditable health and safety performance